KMILOGO2.gif (63546 bytes)

Home What's New Services Favorite Links New Facility Accomplishments

New Facility
           Keith Marine, Inc.

A Variety of Vessels 

 

1978 - 80' Trawler

1979 - 86' Trawler

1978 - 80' Trawler

1979 - 86' Trawler

1980 - 80' ABS Tug

1980 - 68' Tug

1981 - 76' Trawler

1981 - 34' Tug

1982 - 42' Tug

1982 - 104' Yacht

1983 - 84' Trawler

1984 - 80' Trawler

1985 - 88' Yacht

1985 - 55' Tug

1987 - 130' Dinner Cruiser Yacht

1987 - 72' Cruise Tender

1988 - 68' Yacht

1988 - 62' Gondola Dinner Cruiser

1989 - 65' Paddlewheel Dinner Cruiser

1989 - 65' Paddlewheel Dinner Cruiser

1990 - 84' Cruise Tender

1990 - 84' Cruise Tender

1991 - 84' Cruise Tender

1994 - 78' SWATH Dive Boat

1995 - 85' Cruise Tender

1998 - 200' Gambling Casino

1999 - 110' Dinner Cruise Vessel "Caprice"

1999 -88' RCCL Cruise Tender "Pinta"

2000 - 116' Sir Winston Dinner Cruise Vessel

2000 - Polly L Treasure Recovery vessel

2001 - 116' Sir Winston Dinner Cruise Vessel

2002 - 116' Sir Winston Dinner Cruise Vessel

2002 - 125' Endless Dreams Dinner Cruise Vessel

2003 - 62' Trawler Yacht

2003 - 116' Sir Winston Dinner Cruise Vessel

Here are some pictures showing our new facility as it goes up. The new address is at the Putnam County Barge Port. The Barge Port was built during the construction phase of the Cross Florida Barge Canal. The Barge Canal is only a few miles South of our facility on the St. Johns River. The BArge Port was put in to service the heavy barge traffic which was expected. There is a large dredged basin which joins the main channel. The basin is maintained by the County.

bldg3d1.BMP (809014 bytes) (click on image) Here is a 3-D rendering of our building. The main construction building is 100W x 150L x 40' eave height. There is 35W x 150L x 24' eave height office/storage building on the North side of the main construction building. There are 2 levels of office space available.

Yard1027a.jpg (34435 bytes)  Construction of 1000 ton marine railway system and dredging a turnaround basin.

Future expansion plans involve two adjoining pieces of property which we recently purchased. This property is being cleared to prepare for future needs.

prop1.jpg (64425 bytes) prop2.jpg (74691 bytes) prop3.jpg (60491 bytes) Clearing our next expansion project.

Air shot of the yard in January 2000

yardair.JPG (56776 bytes) Rccl Cruise Tender at the dock.

mvc-858s.jpg (43039 bytes) Land cleared, leveled and surveyed for the slab.

mvc-860s.jpg (54891 bytes) Footers dug for the corners.

mvc-089s.jpg (61827 bytes) The Railway footer inside the building foundation

mvc-098s.jpg (47070 bytes) One side framed.

.mvc-124s.jpg (51868 bytes) The building framing complete as of early December 2001.

mvc-293s.jpg (37559 bytes)mvc-282f.jpg (52113 bytes) Getting ready to move in January 12,2002

yardwide.jpg (546762 bytes) Panoramic view

A view from the air

Our new two stories of office space framed out and ready for completion.

framed1.jpg (29409 bytes)  framed3.jpg (29003 bytes) sign.jpg (17051 bytes)

 

We are currently expanding and building new offices in the building.  Photos to be posted soon!

 

 

Copyright © 1998 Keith Marine, Inc.
Last modified: February 14, 2005

 

 

Yacht casino Princesa Contico Yacht shipyard ship yard boat yard boatyard Keith Marine aluminum steel weld tig Entrepreneur Raconteur Eagle tug barge port gambling Palatka Putnam Chamber Commerce Florida industry rail railway railroad syncro lift syncrolift haul out haulout cockpit Nekton Nekton RCCL Royal Carribean Cruise Lines Yacht Yacht Dick Keith Brian Keith trawler SWATH