Here are some pictures showing our new facility as it goes up. The new address is at
the Putnam County Barge Port. The Barge Port was built during the construction phase of
the Cross Florida Barge Canal. The Barge Canal is only a few miles South of our facility
on the St. Johns River. The BArge Port was put in to service the heavy barge traffic which
was expected. There is a large dredged basin which joins the main channel. The basin is
maintained by the County.
(click on image) Here is a 3-D rendering of our
building. The main construction building is 100W x 150L x 40' eave height. There is 35W x
150L x 24' eave height office/storage building on the North side of the main construction
building. There are 2 levels of office space available.
Construction of 1000 ton marine
railway system and dredging a turnaround basin.
Future expansion plans involve two adjoining pieces of property which we recently
purchased. This property is being cleared to prepare for future needs.
Clearing our next
expansion project.
Air shot of the yard in January 2000
Rccl Cruise
Tender at the dock.
Land cleared, leveled and surveyed for
the slab.
Footers dug for the corners.
The Railway footer inside the building
foundation
One side framed.
.
The building framing complete as of early
December 2001.

Getting ready to move in January 12,2002
Panoramic view
A view from the air

Our new two stories of office space framed out and ready for completion.



We are currently expanding and building new offices in the building.
Photos to be posted soon!